• employment Employment
  • online services Online Services
  • document center Document Center
  • maps Maps

Septic Permits

                                Septic Permit process . . .

1 - Contact a licensed designer to design your system.

2 - Bring three (3) sets of designs to Sibley County Environmental Services, 400 Court Ave, Gaylord, 8:00 a.m. - 4:30 p.m., Monday thru Friday

  • Design must show 3 soil pits or borings for both the main site and alternate site (if new house construction)
  • Both sites to be protected per ordinance

3 - Environmental Services will complete an Application for Permit to Install Sewage Treatment System.

4 - Pay appropriate fee:

  • Mound  $430.00
  • Trench  $355.00
  • Upgraded System  $305.00
  • Holding Tank  $405.00
  • Type 4  $630.00

5 - The application and design will be reviewed by Sibley County's Septic Inspector.

6 - An onsite permit and design will be issued by the County upon approval.

  • A Land Use Permit will not be issued until septic design is approved

7 - Upon approval of design and completion of soil verifications, owner hires a licensed installer.

8 - Soil Verifications should be scheduled for Wednesday or by appointment.  Contact Septic Inspector at (320) 234-7222 or (888) 495-6673.  Inspections require 24 hour notice.

9 - Installer must contact Sibley County's Septic Inspector for an inspection when system is ready. There should be a 24-hour notice before work starts. The licensed installer must be on site when inspection is being done. As-Builts are to be given to the Septic Inspector at the time of the tank and/or drain field inspection or sent to the Inspector within 21 days of the final inspection.  A $50.00 fine may be imposed if as-built not received within the 21 days.  If installer provides proper notice and Sibley County does not provide inspection within 2 hours after time set, the installer may complete that portion of the work without an inspection. The installer shall then include photographs of the uncovered system, and is required to schedule any and all required inspections as needed to complete the system.

10 - Once necessary inspections are complete, the Septic Inspector submit copies of the paperwork to Sibley County and a Certificate of Compliance is issued.

  • Home
  • Mission Statement
  • Disclaimer
  • Intranet