FAQs

How many splits/parcels are allowed in each quarter-quarter section?

Do you need a permit for an addition to your home?

Do I need a permit to re-shingle a house or put in new windows or new siding?

What is a Crop Equivalency Rating?

What kind of a permit do I need if I build a 3 or 4-season porch (enclosed) to an existing home?

Is there a building eligibility?

What 5 basic conditions are attached to Conditional Use Permit for a new home on a site?

Do we have a building inspector?

Where do I get an electrical inspection?

Do I need a permit to build or replace a deck or open porch?

Who do I contact for wetland information?

Where do I order trees?

If my property is in torrens property, what do I need to do to split a parcel?

Can I get a building permit online?

How long is a permit valid?

How do I apply for a Conditional Use Permit?

What permits do I need to replace a home?

When do I need a stormwater permit?

What information is needed for a Land Use Permit or Setback Certificate?

Do you need zoning information on a piece of property?

What is the process for a proposed subdivision?

If the septic system is failing after a compliance inspection, how long do I have to replace the septic system?

When would a septic system not require a compliance inspection at property transfer?

How do I get a septic permit?

How often does a septic tank need to be pumped and cleaned?

What is the "Straight-Pipe Law" for septic systems?

When I sell my property, what do I have to do regarding my septic system?

Where do I pick up a Burning Permit?